Sunday, 24 February 2013

Frame work is up, up, up and away!

Well, after a week or so wait, the frames are well on their way.

All the frame work is now done and looking great. The Roof trusses were supposed to be craned on last friday, but due to the wet weather it was a no go.

When we went to have a look, we noticed that the main wall between the hallway and the main living area seemed to be backways - the main opening was in the wrong spot! Whopps! After a quick call to our SS, it was fixed up!

We were quite nervous about the frames being up becasue we brough this house right off the floor plan (and a few tweaks on our end). There wasn't a sydney display of this home. We loved it on paper, and had our fingers crossed that we would still love it once the frames were up and we could walk through it (too late anyway if we didn't). We are happy to say it has exceeded our expecations. Every room is perfect and I'm really loving the open kitchen/dining/lounge area.

The study was alittle smaller than we first thought, so its become more of a library, instead of a usable study - but thats ok with us.

Hopefully the rain stays away long enough next week to get the roof trusses on and the gutter and faschia up...... fingers crossed the weather is good.

Here are a few pics.


This is taken from the kitchen looking into the bedroom

Looking at the from bedrooms and activity room - its a giant mechano set

View from the rear back corner - ensuite on the left, main bed on the right.

View looking at the front door - its a big door! Garage on the left.

Keenan's Theatre room step - couches will be ontop and infornt